THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27., This news data comes from:http://www.xs888999.com
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.
As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.

MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.
Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
- Senate subpoenas 8 DPWH officials, contractors in flood control probe
- Philippines presses call for ceasefire in Gaza
- Anti-fake news bill filed anew in House
- Modi: India, Japan to 'shape the Asian century'
- Supreme Court: It’s work as usual in judiciary
- Oil firms to hike pump prices Tuesday
- Chery Tiggo survives Creamline in cardiac five-setter in PVL Invitationals
- Filipino member of AHOF K-pop group says Manila concert a dream come true
- HEADLINES: DPWH fires Bulacan engineers, blacklists contractors over anomalous projects | Sept. 5, 2025
- LBC Express Holdings top executive to retire in Oct.